US2006062633A1PendingUtilityA1

Method for constructing a pre-cast deck, dock steps and dock system

Individually held — no corporate assignee on recordPriority: Aug 5, 2004Filed: Nov 7, 2005Published: Mar 23, 2006
Est. expiryAug 5, 2024(expired)· nominal 20-yr term from priority
Inventors:Laurie Delzotto
Y02A10/11E02B 3/068
41
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A method of constructing a pre-cast deck, dock step(s) and dock is disclosed utilizing 2 main components, beam(s) and slab(s). Optional accessories are also disclosed that may be added such as hand rail(s), boat bumper(s) and water access ladder(s).

Claims

exact text as granted — not AI-modified
26 . A method for constructing a pre-cast concrete deck, dock step(s) and dock system, said method comprising the steps of: 
 (a) loading a the hardened pre-cast concrete components onto a transportation vehicle;    (b) transporting to the construction site the hardened pre-cast concrete components;    (c) unloading the hardened pre-cast concrete components and moving them to the construction site;    (d) preparing the site to receive the hardened pre-cast concrete components;    (e) erecting the hardened pre-cast concrete components in the appropriate and correct manner;    (d) adding the appropriate accessories, if desired.    
   
   
       27 . The method of  claim 26  wherein the appropriate accessories are selected from the group consisting of hand rail(s), boat bumper-rail(s) and water access ladder(s).

Join the waitlist — get patent alerts

Track US2006062633A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.