Method for constructing a pre-cast deck, dock steps and dock system
Individually held — no corporate assignee on recordPriority: Aug 5, 2004Filed: Nov 7, 2005Published: Mar 23, 2006
Est. expiryAug 5, 2024(expired)· nominal 20-yr term from priority
Inventors:Laurie Delzotto
Y02A10/11E02B 3/068
41
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A method of constructing a pre-cast deck, dock step(s) and dock is disclosed utilizing 2 main components, beam(s) and slab(s). Optional accessories are also disclosed that may be added such as hand rail(s), boat bumper(s) and water access ladder(s).
Claims
exact text as granted — not AI-modified26 . A method for constructing a pre-cast concrete deck, dock step(s) and dock system, said method comprising the steps of:
(a) loading a the hardened pre-cast concrete components onto a transportation vehicle; (b) transporting to the construction site the hardened pre-cast concrete components; (c) unloading the hardened pre-cast concrete components and moving them to the construction site; (d) preparing the site to receive the hardened pre-cast concrete components; (e) erecting the hardened pre-cast concrete components in the appropriate and correct manner; (d) adding the appropriate accessories, if desired.
27 . The method of claim 26 wherein the appropriate accessories are selected from the group consisting of hand rail(s), boat bumper-rail(s) and water access ladder(s).Join the waitlist — get patent alerts