US2005144866A1PendingUtilityA1

Preformed portable slab for use as a foundation or splash pad for industrial equipment

Priority: Sep 19, 2003Filed: Sep 15, 2004Published: Jul 7, 2005
Est. expirySep 19, 2023(expired)· nominal 20-yr term from priority
B65D 90/24E02D 27/01E02D 27/32E02D 27/38
24
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

An apparatus and method of use for a portable precast slab system for industrial equipment that can be placed at locations where permanent foundations cannot be installed, or where an immediately usable foundation is needed. The slab is preferably about 4″-24″ in thickness, preferably at least about 6′ in length, and preferably at least about 6′ in width; multiple pieces may be used to form the slab. The slab may have attachment means incorporated in order to move the slab. If a bulk storage tank is placed upon the slab, preferably at least about 8 feet by about 8 feet area adjacent to the tank will be available for delivery of liquid cryogen. A method of making and using the slab is also contemplated, and the slab may also be used as a splash pad, and a pad for cryogenic pumps.

Claims

exact text as granted — not AI-modified
1 . A method of using a portable precast slab as a foundation for industrial equipment, comprising: 
 providing a portable precast slab that has a top surface, a plurality of side surfaces, a lower surface, a length of at least about 6 feet, a width of at least about 6 feet, and a thickness of at least about 4 inches, wherein said slab is comprised of concrete or cement;    placing the lower surface of the slab on ground;    leveling the slab and/or checking the level of the slab; and    placing at least one piece of industrial equipment on the top surface of the slab.    
   
   
       2 . The method of  claim 1 , further comprising the step of casting reinforcing means into the concrete or cement.  
   
   
       3 . The method of  claim 1 , further comprising the step of providing a means for attachment, wherein said means is accessible from the top surface or side surface of said slab.  
   
   
       4 . The method of  claim 3 , wherein said means for attachment is selected from the group consisting essentially of at least one lift pin, at least one lift ring, at least one lift bolt, an anchor bolt, or a combination thereof.  
   
   
       5 . The method of  claim 3 , further comprising the steps of: 
 attaching a cable to said means for attachment; and    moving the slab.    
   
   
       6 . The method of  claim 1 , wherein the industrial equipment comprises a bulk storage tank.  
   
   
       7 . The method of  claim 6 , further comprising the step of anchoring at least one leg of the bulk storage tank to the slab.  
   
   
       8 . The method of  claim 1 , further comprising the step of installing fencing around the perimeter of the slab and/or the industrial equipment.  
   
   
       9 . The method of  claim 1 , further comprising the steps of: 
 using a slab that comprises multiple pieces; and    placing said pieces adjacent to each other to form the slab.    
   
   
       10 . The method of  claim 6 , further comprising the step of providing a slab having at least about an 8 foot length by about an 8 foot width area on the top surface adjacent to said tank that is available for liquid oxygen delivery after said bulk storage tank is placed on the top surface of said slab.  
   
   
       11 . The method of  claim 1 , further comprising the step of using at least a portion of the slab as a splash pad.  
   
   
       12 . The method of  claim 1 , wherein the industrial equipment comprises at least one cryogenic liquid pump.  
   
   
       13 . The method of  claim 12 , wherein the pad is at least about 6 feet to about 10 feet in width, about 15 feet to about 30 feet in length, and about 4 inches to about 10 inches in thickness.  
   
   
       14 . The method of  claim 12 , wherein the pad is about 8′8″ in width by about 24′ in length, and about 8″ in thickness.  
   
   
       15 . A portable precast reinforced slab used as a foundation for industrial equipment, comprising: 
 a precast or premolded slab comprised of concrete or cement, wherein the slab has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness;    wherein said thickness is at least about 6 inches to about 24 inches, wherein said length is at least about 6 feet, and wherein said width is at least about 6 feet;    wherein the concrete or cement is reinforced by reinforcing means; and    wherein during use the slab is level or substantially level and is used as a foundation for industrial equipment.    
   
   
       16 . The slab of  claim 15 , further comprising means of attachment, wherein said means for attachment is selected from the group consisting essentially of at least one lift pin, at least one lift ring, at least one lift bolt, at least one anchor bolt, and a combination thereof.  
   
   
       17 . The slab of  claim 15 , having a plurality of apertures cast into said slab that are visible from the-top or side surfaces, wherein said apertures can be used to install fence posts therein.  
   
   
       18 . The slab of  claim 15 , having at least one side surface that is shaped and/or sized to interconnect or interface with at least one side surface of another slab.  
   
   
       19 . The slab of  claim 15 , wherein a plurality of rebars or rods are used as the reinforcing means and are cast into the concrete or cement, and wherein said rebars or rods are placed parallel to one another and/or in a criss-cross fashion.  
   
   
       20 . The slab of  claim 15 , wherein the industrial equipment comprises a bulk storage tank.  
   
   
       21 . The slab of  claim 20 , having at least about an 8 foot length by an about 8 foot width area on the top surface adjacent to said tank available for liquid oxygen delivery after the tank is placed upon said slab.  
   
   
       22 . The slab of  claim 19 , wherein said rebars or rods are formed into a support frame and wherein said means for attachment is removably or securably attached to said support frame.  
   
   
       23 . A method of making a precast slab that is used as a foundation for at least one bulk storage tank, comprising: 
 providing a form;    at least partially filling the form with concrete or cement;    placing at least one means for attachment into the concrete or cement;    filling the form with concrete or cement;    allowing the concrete or cement to dry and/or cure, thereby forming a slab, wherein the slab has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness, and wherein said slab is at least about 6 inches thick to about 24 inches thick; and    removing the slab from the form when the concrete or cement is at least partially dried.    
   
   
       24 . The method of  claim 23 , further comprising the steps of: 
 casting a plurality of apertures into said slab that are visible from the top surface;    placing the slab at an industrial site; and    installing fence posts into the apertures.    
   
   
       25 . The method of  claim 23 , further comprising the steps of: 
 constructing a slab that comprises more than one piece; and    providing at least one side surface in said pieces that are shaped so that said pieces are capable of interconnecting or interfacing to form a slab.    
   
   
       26 . The method of  claim 23 , further comprising the step of: 
 casting reinforcing means into the slab.    
   
   
       27 . The method of  claim 26 , further comprising the steps of: 
 using a plurality of rebars or rods as the reinforcing means in the slab; and    placing said rebars or rods placed parallel to one another and/or in a criss-cross fashion.    
   
   
       28 . The method of  claim 26 , wherein said rebars or rods are arranged to form a three-dimensional support structure.  
   
   
       29 . The method of  claim 26 , wherein the rebars or rods are prestressed prior to molding.  
   
   
       30 . The method of  claim 23 , wherein slab is dried and/or cured prior to use.  
   
   
       31 . The method of  claim 23 , further comprising the step of using concrete or cement of different densities to form said slab.  
   
   
       32 . The method of  claim 26 , further comprising the step of making a plurality of furrows in the top surface of said slab to ensure drainage of water from the top surface of said slab.  
   
   
       33 . A method of using a portable precast slab for use as a splash pad for cryogenic liquids, comprising: 
 providing a portable precast slab comprised of concrete or cement, wherein said slab has a top surface, a plurality of side surfaces, a lower surface, a length, a width, and a thickness, wherein said length is at least about 6 feet, wherein said width is at least about 6 feet, and wherein said thickness is at least about 2 inches;    placing the lower surface of the slab on ground;    offloading liquid cryogens over or adjacent to said slab; and    using the top surface of the slab to catch at least a portion of the liquid cryogens that splash from the offloading of said cryogens.    
   
   
       34 . The method of  claim 33 , further comprising the step of casting reinforcing means into the concrete or cement.  
   
   
       35 . The method of  claim 33 , further comprising the step of providing a means for attachment, wherein said means is accessible from the top or side surface of said slab.  
   
   
       36 . The method of  claim 35 , wherein said means for attachment is selected from the group consisting essentially of at least one lift pin, at least one lift ring, at least one lift bolt, an anchor bolt, and a combination thereof.  
   
   
       37 . The method of  claim 35 , further comprising the steps of: 
 attaching a cable to said means for attachment; and    moving the slab.    
   
   
       38 . The method of  claim 33 , further comprising the steps of: 
 using a slab that comprises multiple pieces; and    placing said pieces adjacent to each other to form the slab.    
   
   
       39 . A method for providing a portable precast foundation for a bulk storage tank, comprising: 
 obtaining a portable precast slab that has a top surface, a plurality of side surfaces, a lower surface, a length, a width, and a thickness, wherein said length is between about 6 feet to about 20 feet, wherein said width is about 6 feet to about 12 feet, and wherein said thickness is about 6 inches to about 24 inches;    wherein said slab is comprised of reinforced concrete or cement and wherein said concrete or cement is reinforced by means selected from the group consisting essentially of wire, rebar, rods, or a combination thereof;    moving said slab to its desired location;    placing the lower surface of the slab on substrate;    leveling the slab and/or checking the level of the slab; and    placing a bulk storage tank upon the top surface of the slab.    
   
   
       40 . The method of  claim 39 , further comprising the step of casting a means for attachment into said concrete or cement, wherein said means is accessible from the top or side surface of said slab, and wherein said means is used to move said slab.  
   
   
       41 . The method of  claim 40 , wherein said means for attachment is selected from the group consisting essentially of at least one lift pin, at least one lift ring, at least one lift bolt, at least anchor bolt, and a combination thereof.  
   
   
       42 . The method of  claim 40 , further comprising the step of anchoring at least a part of the bulk storage tank to the slab.  
   
   
       43 . The method of  claim 40 , further comprising the steps of: 
 casting apertures into said concrete or cement;    installing fence posts into said apertures after the slab is placed upon said ground;    attaching fencing to said fence posts; and    installing fencing around the perimeter of the slab and/or the tank.    
   
   
       44 . The method of  claim 40 , further comprising the step using at least a portion of the slab as a splash pad.  
   
   
       45 . The method of  claim 39 , wherein the width of said slab is about 10 feet.  
   
   
       46 . The method of  claim 39 , wherein the length of said slab is about 12 feet.  
   
   
       47 . The method of  claim 39 , wherein the slab is between about 6 inches and 16 inches in thickness.  
   
   
       48 . The method of  claim 39 , wherein the slab is about 10 feet in width, about 15 feet in length, and either about 6 inches in thickness or about 12 inches in thickness.  
   
   
       49 . The method of  claim 39 , wherein the slab is about 10 feet in width, about 15 feet in length, and about 16 inches in thickness.  
   
   
       50 . A method of creating a cryogenic liquid storage and supply system at a location comprising installing at least one portable pre-cast slab foundation and at least one other member selected from the group consisting of: 
 a) a cryogenic liquid storage tank;    b) a vaporizer;    c) a pressure control means;    d) a gas filtering means;    e) a telemetry unit means;    f) a pump means;    g) a tank filling means;    h) a piping support;    i) a gas storage cylinder;    i) a splash pad;    k) fencing; and    l) piping.    
   
   
       51 . The method of  claim 50 , wherein said foundation is installed at substantially the same time as said other members of said system.  
   
   
       52 . The method of  claim 50 , wherein said foundation is removed from a vehicle and placed onto the ground.  
   
   
       53 . The method of  claim 52 , wherein said foundation is removed from said vehicle by a crane.  
   
   
       54 . The method of  claim 50 , wherein said liquid further comprises at least one member selected from the group consisting of: 
 a) nitrogen;    b) oxygen;    c) argon;    d) carbon dioxide;    e) hydrogen; and    f) helium.    
   
   
       55 . The method of  claim 50 , wherein said foundation is installed outdoors.  
   
   
       56 . A method of removing a cryogenic liquid storage supply system from a location wherein all elements of the system, including the foundation, are removed from the installation site.  
   
   
       57 . The method of  claim 56 , wherein said foundation is reusable.  
   
   
       58 . The method of  claim 56 , wherein said foundation is removed from said site with a vehicle.  
   
   
       59 . An apparatus for storing and supplying cryogenic liquids comprising at least one portable pre-cast slab foundation, a cryogenic liquid storage tank and at least one member selected from the group consisting of: 
 a) a vaporizer;    b) a pressure control means;    c) a gas filtering means;    d) a telemetry unit means;    e) a pump means;    f) a tank filling means;    g) a piping support;    h) a gas storage cylinder;    i) a splash pad;    j) fencing; and    k) piping.    
   
   
       60 . The apparatus of  claim 59 , wherein said cryogenic liquid comprises at least one member selected from the group consisting of: 
 a) nitrogen;    b) oxygen;    c) argon;    d) carbon dioxide;    e) hydrogen; and    f) helium.    
   
   
       61 . The apparatus of  claim 59 , wherein said foundation is located outdoors.

Join the waitlist — get patent alerts

Track US2005144866A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.