Abstract
A process of forming powder metal components which minimizes decarburization and oxidation of the component prior to final forging. The process begins by molding powder metal material into a preform configuration. The preform is delubricated to extract lubricant found in the pores of the preform. Passing the preform through a shot peening operation closes a majority of the surface pores creating a densified layer within which interconnected pores are eliminated. Following post-delubrication peening (PDP), the component is sintered and then forged into its final configuration.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A process for the manufacture of powder metal components comprising the steps of:
molding a powder metal material into a preform configuration; delubricating said powder metal preform; subjecting said powder metal preform to shot peening to density an outer layer of said preform; sintering said shot peened preform; and forging said sintered preform.
2 . The process as defined in claim 1 wherein said powder metal preform is subjected to a shot speed of less than 100 meters per second.
3 . The process as defined in claim 1 wherein said powder metal preform is delubricated at a temperature between 1200° F. and 1800° F. in an atmosphere which includes N 2 and H 2 .
4 . A process for the manufacture of powder metal components comprising the steps of:
molding a powder metal material into a preform configuration; subjecting said preform to a process for densifying the surface of said preform; sintering said preform; and forging said preform.
5 . The process of claim 4 wherein said surface densification process comprises shot peening.
6 . The process of claim 5 wherein the shot hardness is between 47 to 51 Re.
7 . The process as defined in claim 5 wherein said powder metal preform is subjected to a shot speed of less than 100 meters per second.
8 . The process as defined in claim 4 wherein said sintering of said preform is preformed in a furnace less than 2,450° F.
9 . The process as defined in claim 8 wherein said perform is sintered in said furnace for less than 60 minutes.Join the waitlist — get patent alerts