US2003234091A1PendingUtilityA1

Steel tube useful in pole, pylon, or tower, filled at least partially with cementitious material, and comprising plural sections bolted to one another at end flanges

Priority: Jun 20, 2002Filed: Jun 20, 2002Published: Dec 25, 2003
Est. expiryJun 20, 2022(expired)· nominal 20-yr term from priority
E04H 12/08E04H 12/12
36
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

In a steel tube filled at least partially with a cementitious material, which is pumped into the steel tube and which is allowed to cure, and comprising plural sections, which have end flanges and which are bolted together at the flanges, the flanges contacted by the cementitious material have gaskets to prevent the cementitious material from being extruded between the flanges contacted by the cementitious material before the cementitious material has cured. The flanges having the gaskets are external flanges. The tube sections meeting at the flanges having the gaskets have notches, within which the gaskets are seated, so as to allow the flanges to have flange-to-flange contact, except where the gaskets are seated in the notches.

Claims

exact text as granted — not AI-modified
1 . In a steel tube filled at least partially with a cementitious material, which is pumped into the steel tube and which is allowed to cure, and comprising plural sections, which have end flanges and which are bolted together at the flanges, an improvement wherein the flanges contacted by the cementitious material have means to prevent the cementitious material from being extruded between the flanges contacted by the cementitious material before the cementitious material has cured.  
     
     
         2 . In a steel tube filled at least partially with a cementitious material, which is pumped into the steel tube and which is allowed to cure, and comprising plural sections, which have end flanges and which are bolted together at the flanges, an improvement wherein the flanges contacted by the cementitious material have gaskets to prevent the cementitious material from being extruded between the flanges contacted by the cementitious material before the cementitious material has cured.  
     
     
         3 . In a steel tube filled at least partially with a cementitious material, which is pumped into the steel tube and which is allowed to cure, and comprising plural sections, which have end flanges and which are bolted together at the flanges, an improvement wherein the flanges contacted by the cementitious material are external flanges, which have gaskets to prevent the cementitious material from being extruded between the flanges contacted by the cementitious material before the cementitious material has cured.  
     
     
         4 . The improvement of  claim 2  wherein the tube sections meeting at the flanges having the gaskets have notches, within which the gaskets are seated, so as to allow the flanges to have flange-to-flange contact, except where the gaskets are seated in the notches.  
     
     
         5 . The improvement of  claim 3  wherein the tube sections meeting at the flanges having the gaskets have notches, within which the gaskets are seated, so as to allow the flanges having the gaskets to have flange-to-flange contact, except where the gaskets are seated in the notches.

Join the waitlist — get patent alerts

Track US2003234091A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.