Beam management systems and methods
Abstract
A UE RX beam training procedure in which a user equipment (UE) is configured such that the UE selects a UE RX beam based not only on a measurement of a first reference signal (RS1) transmitted using a first TX beam, but also based on a measurement of a second reference signal (RS2) transmitted using a second TX beam. For example, the UE may be provisioned with “interference” information indicating one or more reference signals that the UE should consider as interference. An advantage with these proposals is that the UE RX beam can be determined not only on maximizing received power, but also by taking predicted interference in to account, which can lead to a higher quality of service and/or a higher throughput.
Claims
exact text as granted — not AI-modifiedThe invention claimed is:
1. A method for beam management performed by a user equipment (UE), the method comprising:
using a first UE receive (RX) beam, receiving both a first reference signal (RS 1 ) and a second reference signal (RS 2 ), wherein a first base station (BS) transmit (TX) beam was used to transmit RS 1 and a second BS TX beam was used to transmit RS 2 ;
producing a first power value (P1) indicative of the power of RS 1 received using the first UE RX beam;
producing a second power value (P2) indicative of the power of RS 2 received using the first UE RX beam;
calculating a first value (V1) using P1 and P2 as inputs to the calculation; and
the UE selecting a UE RX beam from a set of candidate UE RX beams using the calculated first value (V1), wherein said set of candidate UE RX beams includes the first UE RX beam, and each recited UE RX beam is a beam that originates at the UE.
2. The method of claim 1 , further comprising:
using a second RX beam, receiving both RS 1 and RS 2 ;
producing a third power value (P3) indicative of the power of RS 1 received using the second RX beam;
producing a fourth power value (P4) indicative of the power of RS 2 received using the second RX beam;
calculating a second value (V2) using P3 and P4 as inputs to the calculation; and
selecting an RX beam from a set of candidate RX beams using both V1 and V2, wherein said set of candidate RX beams further includes the second RX beam.
3. The method of claim 2 , wherein selecting an RX beam from the set of candidate RX beams using both V1 and V2 comprises comparing V1 with V2.
4. The method of claim 2 , wherein
calculating V1 comprises calculating V1=P1/(P2+N 1 ), wherein N 1 is a determined noise value and N 1 is greater than or equal to zero; and
calculating V2 comprises calculating V2=P3/(P4+N 2 ), wherein N 2 is a determined noise value and N 2 is greater than or equal to zero.
5. The method of claim 2 , wherein selecting an RX beam from the set of candidate RX beams using both V1 and V2 comprises:
comparing V1 with V2 to determine which is greater; and
performing one of: i) selecting the first RX beam as a result of determining that V1 is greater than V2 and ii) selecting the second RX beam as a result of determining that V2 is greater than V1.
6. The method of claim 1 , further comprising:
the UE receiving a message transmitted by a network node, the message comprising information that a) identifies a resource that is used to transmit RS 2 and b) instructs the UE to treat RS 2 as an interfering signal.
7. The method of claim 6 , wherein
the message further comprises information that a) identifies a resource that is used to transmit RS 1 and b) causes the UE to not treat RS 1 as an interfering signal.
8. The method of claim 6 , wherein the message is one of: i) a downlink control information (DCI) message transmitted using a physical downlink control channel, ii) a Radio Resource Control message, and iii) a Media Access Control message.
9. The method of claim 1 , further comprising
the UE obtaining from a local storage unit information that a) identifies a resource that is used to transmit RS 2 and b) instructs the UE to treat RS 2 as an interfering signal.
10. The method of claim 9 , wherein the information obtained from the local storage unit further comprises information that a) identifies a resource that is used to transmit RS 1 and b) causes the UE to not treat RS 1 as an interfering signal.
11. The method of claim 1 , wherein
producing P1 comprises determining the reference signal received power (RSRP) of RS 1 , and
producing P2 comprises determining the RSRP of RS 2 .
12. A computer program product comprising a non-transitory computer readable medium storing a computer program comprising instructions which, when executed on at least one processor, causes the at least one processor to carry out the method of claim 1 .
13. The method of claim 1 , wherein calculating V1 comprises:
calculating V1=P1/(P2+N 1 ), wherein N 1 is a determined noise value and N 1 is greater than or equal to zero.
14. A user equipment (UE), the UE comprising:
a local storage unit; and
a data processing apparatus coupled to the local storage unit, wherein the UE is configured to:
use a first UE receive (RX) beam to receive both a first reference signal (RS 1 ) and a second reference signal (RS 2 ), wherein a first base station (BS) transmit (TX) beam was used to transmit RS 1 and a second BS TX beam was used to transmit RS 2 ;
produce a first power value (P1) indicative of the power of RS 1 received using the first UE RX beam;
produce a second power value (P2) indicative of the power of RS 2 received using the first UE RX beam;
calculate a first value (V1) using P1 and P2 as inputs to the calculation; and
select a UE RX beam from a set of candidate UE RX beams using the calculated first value (V1), wherein said set of candidate UE RX beams includes the first UE RX beam.
15. The UE of claim 14 , wherein the UE is configured to calculate V1 by calculating V1=P1/(P2+N 1 ), wherein N 1 is a determined noise value and N 1 is greater than or equal to zero.
16. The UE of claim 14 , wherein the UE is further configured to:
use a second RX beam, receiving both RS 1 and RS 2 ;
produce a third power value (P3) indicative of the power of RS 1 received using the second RX beam;
produce a fourth power value (P4) indicative of the power of RS 2 received using the second RX beam;
calculate a second value (V2) using P3 and P4 as inputs to the calculation; and
select an RX beam from a set of candidate RX beams using both V1 and V2, wherein said set of candidate RX beams further includes the second RX beam.
17. The UE of claim 16 , wherein the UE is configured to select an RX beam from the set of candidate RX beams using both V1 and V2 by performing a process that comprises comparing V1 with V2.
18. The UE of claim 16 , wherein
the UE is configured to calculate V1 by calculating V1=P1/(P2+N 1 ), wherein N 1 is a determined noise value and N 1 is greater than or equal to zero; and
the UE is configured to calculate V1 by calculating V2=P3/(P4+N 2 ), wherein N 2 is a determined noise value and N 2 is greater than or equal to zero.
19. The UE of claim 16 , wherein the UE is configured to select an RX beam from the set of candidate RX beams using both V1 and V2 by performing a process that comprises:
comparing V1 with V2 to determine which is greater; and
performing one of: i) selecting the first RX beam as a result of determining that V1 is greater than V2 and ii) selecting the second RX beam as a result of determining that V2 is greater than V1.Join the waitlist — get patent alerts
Track US10985829B2 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.