Inventor · disambiguated record
Ted A. Long
Also filed as: LONG TED A · LONG TED ALAN
33 granted patents·7 pending applications·448 citations·filing 1999–2021
97Inventor score
Files withEXXONMOBIL UPSTREAM RES CO9FISHER CONTROLS INT6EXXONMOBIL TECHNOLOGY & ENGINEERING COMPANY5ROMER MICHAEL C4SEARLES KEVIN H3
Top patents by PatentIndex Score
40 records- 0196US7971642B2Gravel packing methodsEXXONMOBIL UPSTREAM RES CO·Filed 2010·Granted Jul 5, 2011·31 cites·40 claims
- 0296US6701957B2Fluid pressure reduction deviceFISHER CONTROLS INT·Filed 2001·Granted Mar 9, 2004·61 cites·19 claims
- 0396US6095196ATortuous path fluid pressure reduction deviceFISHER CONTROLS INT·Filed 1999·Granted Aug 1, 2000·106 cites·16 claims
- 0494US7661476B2Gravel packing methodsEXXONMOBIL UPSTREAM RES CO·Filed 2007·Granted Feb 16, 2010·58 cites·18 claims
- 0592US8011437B2Wellbore method and apparatus for completion, production and injectionEXXONMOBIL UPSTREAM RES CO·Filed 2011·Granted Sep 6, 2011·14 cites·11 claims
- 0692US6935370B2Fluid pressure reduction deviceFISHER CONTROLS INT·Filed 2004·Granted Aug 30, 2005·38 cites·6 claims
- 0791US10030508B2Method for monitoring gas lift wells using minimal concentration tracer materialsROMER MICHAEL C·Filed 2016·Granted Jul 24, 2018·9 cites·26 claims
- 0890US8186429B2Wellbore method and apparatus for completion, production and injectionYEH CHARLES S·Filed 2011·Granted May 29, 2012·10 cites·13 claims
- 0990US7938184B2Wellbore method and apparatus for completion, production and injectionEXXONMOBIL UPSTREAM RES CO·Filed 2007·Granted May 10, 2011·27 cites·58 claims
- 1089US8430160B2Wellbore method and apparatus for completion, production and injectionYEH CHARLES S·Filed 2012·Granted Apr 30, 2013·9 cites·8 claims
- 1189US7013918B2Fluid pressure reduction deviceFISHER CONTROLS INT·Filed 2005·Granted Mar 21, 2006·14 cites·7 claims
- 1285US8347956B2Wellbore method and apparatus for completion, production and injectionEXXONMOBIL UPSTREAM RES CO·Filed 2012·Granted Jan 8, 2013·6 cites·9 claims
- 1380US8356664B2Wellbore method and apparatus for completion, production and injectionEXXONMOBIL UPSTREAM RES CO·Filed 2012·Granted Jan 22, 2013·4 cites·6 claims
- 1478US11035201B2Hydrocarbon wells including electrically actuated gas lift valve assemblies and methods of providing gas lift in a hydrocarbon wellFRAZIER CHRISTOPHER C·Filed 2019·Granted Jun 15, 2021·7 cites·14 claims
- 1576US11293276B2Monitoring a fracture in a hydrocarbon wellEXXONMOBIL UPSTREAM RES CO·Filed 2020·Granted Apr 5, 2022·1 cites·25 claims
- 1674US7066447B2Sleeve valve with adjustable flow characteristicsFISHER CONTROLS INT·Filed 2003·Granted Jun 27, 2006·17 cites·21 claims
- 1773US11261725B2Systems and methods for estimating and controlling liquid level using periodic shut-insGUPTA ROBIN·Filed 2018·Granted Mar 1, 2022·2 cites·28 claims
- 1873US10012059B2Gas lift optimization employing data obtained from surface mounted sensorsROMER MICHAEL C·Filed 2015·Granted Jul 3, 2018·2 cites·23 claims
- 1972US12013303B2Apparatus and method for non-intrusive pressure measurement and early identification of solids formation using selected guided ultrasonic wave modesEXXONMOBIL TECHNOLOGY & ENGINEERING COMPANY·Filed 2021·Granted Jun 18, 2024·0 cites·24 claims
- 2069US9593559B2Fluid filtering device for a wellbore and method for completing a wellboreYEH CHARLES S·Filed 2012·Granted Mar 14, 2017·4 cites·40 claims
- 2169US9068447B2Methods for stimulating multi-zone wellsALVAREZ JOSE OLIVERIO·Filed 2011·Granted Jun 30, 2015·4 cites·30 claims
- 2269US7055548B2Control valve trim and seat design for valve trim with minimal unbalanced areaFISHER CONTROLS INT·Filed 2003·Granted Jun 6, 2006·17 cites·18 claims
- 2359US11906689B2Hydrocarbon wells and methods for monitoring fracture morphology of a fracture that extends from a wellbore of the hydrocarbon wellsEXXONMOBIL TECHNOLOGY & ENGINEERING COMPANY·Filed 2020·Granted Feb 20, 2024·0 cites·25 claims
- 2453US8165816B2Fluid injection management method for hydrocarbon recoverySEARLES KEVIN H·Filed 2007·Granted Apr 24, 2012·6 cites·19 claims
- 2550US9725989B2Sand control screen having improved reliabilityMAYER CHRISTIAN S·Filed 2014·Granted Aug 8, 2017·1 cites·39 claims
- 2649US11767753B2Method for flow profiling using transient active-source heating or cooling and temperature profilingEXXONMOBIL TECHNOLOGY & ENGINEERING COMPANY·Filed 2019·Granted Sep 26, 2023·0 cites·17 claims
- 2748US11180985B2Systems and methods for dynamic liquid level monitoring and controlDORAISWAMY SRIRAM·Filed 2018·Granted Nov 23, 2021·0 cites·28 claims
- 2843US11255190B2Hydrocarbon wells and methods of interrogating fluid flow within hydrocarbon wellsEXXONMOBIL UPSTREAM RES CO·Filed 2020·Granted Feb 22, 2022·0 cites·17 claims
- 2942US2008065362A1Well completion modeling and management of well completionLEE JIM H·Filed 2007·Application pending·0 cites
- 3041US12001762B2Method for performing well performance diagnosticsEXXONMOBIL TECHNOLOGY & ENGINEERING COMPANY·Filed 2019·Granted Jun 4, 2024·0 cites·18 claims
- 3141US2017044876A1Production Surveillance and Optimization Employing Data Obtained from Surface Mounted SensorsROMER MICHAEL C·Filed 2016·Application pending·0 cites
- 3238US2016041132A1Fingerprinting for gas lift diagnosticsROMER MICHAEL C·Filed 2015·Application pending·0 cites
- 3337US11401799B2Drill strings with probe deployment structures, hydrocarbon wells that include the drill strings, and methods of utilizing the drill stringsEXXONMOBIL UPSTREAM RES CO·Filed 2020·Granted Aug 2, 2022·0 cites·23 claims
- 3436US11098575B2Method for flow profiling using active-source heating or cooling and temperature profilingSEABROOK BRIAN C·Filed 2019·Granted Aug 24, 2021·0 cites·14 claims
- 3536US2003062495A1Fluid control valve with low pressure drop ratio factorFiled 2002·Application pending·0 cites
- 3635US11755795B2Detecting and mitigating flow instabilities in hydrocarbon production wellsEXXONMOBIL TECHNOLOGY & ENGINEERING COMPANY·Filed 2018·Granted Sep 12, 2023·0 cites·6 claims
- 3734US2011067871A1Methods For Regulating Flow In Multi-Zone IntervalsBURDETTE JASON A·Filed 2009·Application pending·0 cites
- 3833US2009292516A1Earth Stress Management and Control Process For Hydrocarbon RecoverySEARLES KEVIN H·Filed 2007·Application pending·0 cites
- 3933US2009240478A1Earth Stress Analysis Method For Hydrocarbon RecoverySEARLES KEVIN H·Filed 2007·Application pending·0 cites
- 4031US9175555B2Fluid injection completion techniquesDUFFY BRIAN W·Filed 2009·Granted Nov 3, 2015·0 cites·21 claims
Join the waitlist — get patent alerts
Get an alert when Ted A. Long files or is granted a new patent.
We store only your email — no account needed. See our privacy policy.
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →