Inventor · disambiguated record
Michael S. Briesch
Also filed as: BRIESCH MICHAEL · BRIESCH MICHAEL S · BRIESCH MICHAEL SCOT
24 granted patents·5 pending applications·797 citations·filing 1993–2016
96Inventor score
Files withWESTINGHOUSE ELECTRIC CORP7BRIESCH MICHAEL S6SIEMENS POWER GENERATION INC6SIEMENS WESTINGHOUSE POWER4SIEMENS ENERGY INC3
Top patents by PatentIndex Score
29 records- 0196US5782076AClosed loop air cooling system for combustion turbinesWESTINGHOUSE ELECTRIC CORP·Filed 1996·Granted Jul 21, 1998·160 cites·20 claims
- 0294US5640840ARecuperative steam cooled gas turbine method and apparatusWESTINGHOUSE ELECTRIC CORP·Filed 1994·Granted Jun 24, 1997·111 cites·14 claims
- 0393US5473898AMethod and apparatus for warming a steam turbine in a combined cycle power plantWESTINGHOUSE ELECTRIC CORP·Filed 1995·Granted Dec 12, 1995·82 cites·10 claims
- 0492US7299619B2Vaporization of liquefied natural gas for increased efficiency in power cyclesSIEMENS POWER GENERATION INC·Filed 2004·Granted Nov 27, 2007·92 cites·9 claims
- 0587US5845481ACombustion turbine with fuel heating systemWESTINGHOUSE ELECTRIC CORP·Filed 1997·Granted Dec 8, 1998·119 cites·26 claims
- 0686US8715379B2Advanced ASU and HRSG integration for improved integrated gasification combined cycle efficiencyBRIESCH MICHAEL S·Filed 2011·Granted May 6, 2014·6 cites·5 claims
- 0785US8286431B2Combined cycle power plant including a refrigeration cycleBRIESCH MICHAEL S·Filed 2009·Granted Oct 16, 2012·11 cites·19 claims
- 0883US6957540B1Multi-mode complex cycle power plantSIEMENS WESTINGHOUSE POWER·Filed 2004·Granted Oct 25, 2005·28 cites·16 claims
- 0981US5375410ACombined combustion and steam turbine power plantWESTINGHOUSE ELECTRIC CORP·Filed 1993·Granted Dec 27, 1994·41 cites·6 claims
- 1080US8075646B2Advanced ASU and HRSG integration for improved integrated gasification combined cycle efficiencyBRIESCH MICHAEL S·Filed 2006·Granted Dec 13, 2011·6 cites·5 claims
- 1179US5564269ASteam injected gas turbine system with topping steam turbineWESTINGHOUSE ELECTRIC CORP·Filed 1994·Granted Oct 15, 1996·42 cites·19 claims
- 1278US6804964B2Water recovery from combustion turbine exhaustSIEMENS WESTINGHOUSE POWER·Filed 2002·Granted Oct 19, 2004·19 cites·34 claims
- 1377US7976621B2System for recovering water from flue gasSIEMENS ENERGY INC·Filed 2010·Granted Jul 12, 2011·4 cites·15 claims
- 1474US8152874B2Systems and methods for integration of gasification and reforming processesBRIESCH MICHAEL S·Filed 2006·Granted Apr 10, 2012·4 cites·3 claims
- 1574US5442908ACombined combustion and steam turbine power plantWESTINGHOUSE ELECTRIC CORP·Filed 1994·Granted Aug 22, 1995·33 cites·6 claims
- 1666US7874139B2IGCC design and operation for maximum plant output and minimum heat rateSIEMENS ENERGY INC·Filed 2006·Granted Jan 25, 2011·9 cites·15 claims
- 1760US10280809B2Methods for operating a combined cycle power plant and improving part load efficiencySIEMENS ENERGY INC·Filed 2016·Granted May 7, 2019·0 cites·12 claims
- 1858US10316700B2Combined cycle power plant having supercritical steam turbineSIEMENS AG·Filed 2016·Granted Jun 11, 2019·0 cites·18 claims
- 1958US8061002B2Combined cycle power generationBRIESCH MICHAEL S·Filed 2007·Granted Nov 22, 2011·5 cites·13 claims
- 2056US7367177B2Combined cycle power plant with auxiliary air-cooled condenserSIEMENS POWER GENERATION INC·Filed 2004·Granted May 6, 2008·6 cites·8 claims
- 2152US7325400B2Rankine cycle and steam power plant utilizing the sameSIEMENS POWER GENERATION INC·Filed 2004·Granted Feb 5, 2008·8 cites·21 claims
- 2250US10519816B2Low load turndown for combined cycle power plantsSIEMENS AG·Filed 2014·Granted Dec 31, 2019·0 cites·15 claims
- 2350US8414667B2Supercritical pressurization of fuel slurryBRIESCH MICHAEL S·Filed 2006·Granted Apr 9, 2013·0 cites·12 claims
- 2447US2007175333A1System for recovering water from flue gasSIEMENS POWER GENERATION INC·Filed 2006·Application pending·0 cites
- 2544US2007181854A1Advanced integration for improved integrated gasification combined cycle efficiencySIEMENS POWER GENERATION INC·Filed 2006·Application pending·0 cites
- 2644US2007256424A1Heat recovery gas turbine in combined brayton cycle power generationSIEMENS POWER GENERATION INC·Filed 2006·Application pending·0 cites
- 2742US2015028675A1Electrical power system and method for operating an electrical power systemSCHEURLEN MICHAEL·Filed 2013·Application pending·0 cites
- 2839US2006254280A1Combined cycle power plant using compressor air extractionSIEMENS WESTINGHOUSE POWER·Filed 2005·Application pending·0 cites
- 2935US5911875AMethod and system for generating power from residual fuel oilSIEMENS WESTINGHOUSE POWER·Filed 1997·Granted Jun 15, 1999·11 cites·28 claims
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →