Inventor · disambiguated record
Richard A. Sukup
Also filed as: SUKUP RICHARD A · SUKUP RICHARD ANTHONY
10 granted patents·5 pending applications·481 citations·filing 1978–2019
91Inventor score
Files withMCMORAN OIL & GAS LLC5SUKUP RICHARD A3WESTERN CO OF NORTH AMERICA3MOBIL OIL CORP2BAKER HUGHES INC1
Top patents by PatentIndex Score
15 records- 0197US4708202ADrillable well-fluid flow control toolWESTERN CO OF NORTH AMERICA·Filed 1986·Granted Nov 24, 1987·259 cites·32 claims
- 0292US5406983ACorrosion-resistant composite couplings and tubular connectionsMOBIL OIL CORP·Filed 1994·Granted Apr 18, 1995·94 cites·15 claims
- 0370US7195066B2Engineered solution for controlled buoyancy perforatingSUKUP RICHARD A·Filed 2003·Granted Mar 27, 2007·37 cites·36 claims
- 0469US2019151743A1Engineered Methodology for Design Verification and Validation of Ultra-Deep High Pressure High Temperature Oil and Gas Well Control EquipmentMCMORAN OIL & GAS LLC·Filed 2018·Application pending·0 cites
- 0565US5404944ADownhole makeup tool for threaded tubularsBAKER HUGHES INC·Filed 1993·Granted Apr 11, 1995·45 cites·10 claims
- 0658US2020070034A1Engineered Methodology for Design Verification and Validation of Ultra-Deep High Pressure High Temperature Oil and Gas Well Control EquipmentMCMORAN OIL & GAS LLC·Filed 2019·Application pending·0 cites
- 0758US2018256964A1Engineered Methodology for Design Verification and Validation of Ultra-Deep High Pressure High Temperature Oil and Gas Well Control EquipmentMCMORAN OIL & GAS LLC·Filed 2018·Application pending·0 cites
- 0856US8688418B2Engineered methodology for design verification and validation of ultra-deep high pressure high temperature oil and gas well control equipmentSUKUP RICHARD ANTHONY·Filed 2011·Granted Apr 1, 2014·1 cites·43 claims
- 0951US2016275233A1Engineered Methodology for Design Verification and Validation of Ultra-Deep High Pressure High Temperature Oil and Gas Well Control EquipmentMCMORAN OIL & GAS LLC·Filed 2016·Application pending·0 cites
- 1050US2014156239A1Engineered methodology for design verification and validation of ultra-deep high pressure high temperature oil and gas well control equipmentMCMORAN OIL & GAS LLC·Filed 2014·Application pending·0 cites
- 1147US4706933AOil and gas well safety valveSUKUP RICHARD A·Filed 1985·Granted Nov 17, 1987·25 cites·2 claims
- 1237US4679624AHydraulic setting toolWESTERN CO OF NORTH AMERICA·Filed 1985·Granted Jul 14, 1987·10 cites·32 claims
- 1334US4735268AMechanical setting toolWESTERN CO OF NORTH AMERICA·Filed 1986·Granted Apr 5, 1988·8 cites·15 claims
- 1427US5287928AApparatus and method for repairing a gravel-packed well completionMOBIL OIL CORP·Filed 1992·Granted Feb 22, 1994·1 cites·20 claims
- 1527US4161334AProtective appendage for a steering columnSUKUP RICHARD A·Filed 1978·Granted Jul 17, 1979·1 cites·8 claims
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →