Inventor · disambiguated record
Ahmed Y. Bukhamseen
Also filed as: BUKHAMSEEN AHMED · BUKHAMSEEN AHMED Y · BUKHAMSEEN AHMED YASIN
20 granted patents·1 pending application·44 citations·filing 2011–2024
92Inventor score
Top patents by PatentIndex Score
21 records- 0196USD975107SPortion of a display screen with graphical user interfaceSAUDI ARABIAN OIL CO·Filed 2019·Granted Jan 10, 2023·18 cites·1 claims
- 0290US11002093B2Semi-autonomous downhole taxi with fiber optic communicationSAUDI ARABIAN OIL CO·Filed 2019·Granted May 11, 2021·6 cites·20 claims
- 0387US10429533B2Electrical submersible pump monitoring and failure predictionSAUDI ARABIAN OIL CO·Filed 2019·Granted Oct 1, 2019·3 cites·7 claims
- 0483US11326423B2Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settingsSAUDI ARABIAN OIL CO·Filed 2019·Granted May 10, 2022·3 cites·20 claims
- 0580US12000227B1Untethered near-wellbore stimulationSAUDI ARABIAN OIL CO·Filed 2023·Granted Jun 4, 2024·1 cites·22 claims
- 0680US10890067B2Method to use a buoyant body to measure two-phase flow in horizontal wellsSAUDI ARABIAN OIL CO·Filed 2019·Granted Jan 12, 2021·3 cites·25 claims
- 0777US10908007B1Multiphase flow metering system for horizontal well compartmentsSAUDI ARABIAN OIL CO·Filed 2019·Granted Feb 2, 2021·1 cites·13 claims
- 0877US10883810B2Subterranean well torpedo systemSAUDI ARABIAN OIL CO·Filed 2019·Granted Jan 5, 2021·2 cites·21 claims
- 0977US10571590B2Electrical submersible pump monitoring and failure predictionSAUDI ARABIAN OIL CO·Filed 2019·Granted Feb 25, 2020·1 cites·23 claims
- 1077US10310128B1Electrical submersible pump monitoring and failure predictionSAUDI ARABIAN OIL CO·Filed 2019·Granted Jun 4, 2019·1 cites·5 claims
- 1172US12460521B2Methods and systems for differentiating different types of fluids in a fluid streamSAUDI ARABIAN OIL CO·Filed 2023·Granted Nov 4, 2025·0 cites·11 claims
- 1269US10557317B2Systems and methods for pipe concentricity, zonal isolation, and stuck pipe preventionSAUDI ARABIAN OIL CO·Filed 2017·Granted Feb 11, 2020·1 cites·18 claims
- 1368US11821289B2Automated production optimization technique for smart well completions using real-time nodal analysisSAUDI ARABIAN OIL CO·Filed 2019·Granted Nov 21, 2023·1 cites·20 claims
- 1463US10288760B2Electrical submersible pump monitoring and failure predictionSAUDI ARABIAN OIL CO·Filed 2012·Granted May 14, 2019·1 cites·7 claims
- 1562US10330811B2Electrical submersible pump monitoring and failure predictionSAUDI ARABIAN OIL CO·Filed 2019·Granted Jun 25, 2019·0 cites·4 claims
- 1660US8613311B2Apparatus and methods for well completion design to avoid erosion and high friction loss for power cable deployed electric submersible pump systemsXIAO JINJIANG·Filed 2011·Granted Dec 24, 2013·2 cites·27 claims
- 1755US10947811B2Systems and methods for pipe concentricity, zonal isolation, and stuck pipe preventionSAUDI ARABIAN OIL CO·Filed 2020·Granted Mar 16, 2021·0 cites·20 claims
- 1850US12228010B1Eutectic alloy system for casing-casing annulus cement repairSAUDI ARABIAN OIL CO·Filed 2024·Granted Feb 18, 2025·0 cites·20 claims
- 1945US11499423B2Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibrationSAUDI ARABIAN OIL CO·Filed 2019·Granted Nov 15, 2022·0 cites·20 claims
- 2045US11441395B2Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modelingSAUDI ARABIAN OIL CO·Filed 2019·Granted Sep 13, 2022·0 cites·20 claims
- 2143US2024175349A1Untethered downhole tools and related methods of generating vertical seismic profilesSAUDI ARABIAN OIL CO·Filed 2022·Application pending·0 cites
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →