Inventor · disambiguated record
Matthew H. Zemke
Also filed as: ZEMKE MATTHEW H
25 granted patents·11 pending applications·89 citations·filing 2006–2015
94Inventor score
Top patents by PatentIndex Score
36 records- 0186US7937176B2Hybrid part installation process combining mass part installation techniques with discrete part number assembly activitiesIBM·Filed 2008·Granted May 3, 2011·9 cites·20 claims
- 0286US7437205B2Method for manufacturing with engineering change overrideIBM·Filed 2006·Granted Oct 14, 2008·12 cites·9 claims
- 0382US7920935B2Activity based real-time production instruction adaptationIBM·Filed 2008·Granted Apr 5, 2011·8 cites·20 claims
- 0482US7610112B2Method for manufacturing with engineering change overrideIBM·Filed 2008·Granted Oct 27, 2009·8 cites·16 claims
- 0581US8244644B2Supply chain multi-dimensional serial containment processKNIPFER IVORY WELLMAN·Filed 2007·Granted Aug 14, 2012·12 cites·18 claims
- 0677US7680554B2Method for associating objects in a manufacturing processIBM·Filed 2006·Granted Mar 16, 2010·6 cites·7 claims
- 0776US7269474B1Controlled self-adjusting process for reducing selected dimensions of electronic productsIBM·Filed 2006·Granted Sep 11, 2007·4 cites·20 claims
- 0875US10083416B2Time phase work pool management for returned inventory asset routingDEL ROSARIO FRANCIS E·Filed 2008·Granted Sep 25, 2018·7 cites·16 claims
- 0975US9014827B2Dynamically generating a manufacturing production work flow with selectable sampling strategiesERICKSON STEVEN C·Filed 2010·Granted Apr 21, 2015·2 cites·21 claims
- 1075US8145336B2Real-time assembly and part validation and auto-dispositionKNIPFER IVORY W·Filed 2008·Granted Mar 27, 2012·4 cites·18 claims
- 1174US7818221B2Method and apparatus for variable regulatory or conditional use compliance maximizing use of available inventoryIBM·Filed 2006·Granted Oct 19, 2010·5 cites·20 claims
- 1273US7333870B2Self-adjusting inventory management process for personalizing and re-personalizing partsIBM·Filed 2006·Granted Feb 19, 2008·4 cites·17 claims
- 1372US10169807B2Manufacturing adaptive order load for complex configure to order productsIBM·Filed 2015·Granted Jan 1, 2019·1 cites·7 claims
- 1472US7702544B2Method for assisting selection of a build ahead configuration for use in supplying an ordered productIBM·Filed 2007·Granted Apr 20, 2010·3 cites·20 claims
- 1566US8949149B2Attribute based inventory usage and stockingDEL ROSARIO FRANCIS E·Filed 2007·Granted Feb 3, 2015·1 cites·20 claims
- 1664US8121910B2Automatic loaner part replacement to prevent system callbackSYME FRASER ALLAN·Filed 2008·Granted Feb 21, 2012·1 cites·12 claims
- 1763US8165931B2Automated purchase assembly conversion process to support a dynamic configure-to-order production operationGRAEFE MATTHIAS·Filed 2009·Granted Apr 24, 2012·2 cites·17 claims
- 1859US2010042516A1Part Number Set SubstitutionIBM·Filed 2008·Application pending·0 cites
- 1958US10169737B2Converting assets for reuse during manufacturingERICKSON STEVEN C·Filed 2008·Granted Jan 1, 2019·0 cites·20 claims
- 2058US8352337B2Automatic loaner part replacement to prevent system callbackIBM·Filed 2011·Granted Jan 8, 2013·0 cites·9 claims
- 2158US8290606B2Controlled cancellation for production flow and physical assetsKNIPFER IVORY W·Filed 2008·Granted Oct 16, 2012·0 cites·14 claims
- 2257US2009171735A1Automated kitting for short build manufacturingIBM·Filed 2007·Application pending·0 cites
- 2356US2016055434A1Dynamic risk assessment based product samplingLENOVO ENTPR SOLUTIONS SINGAPORE PTE LTD·Filed 2014·Application pending·0 cites
- 2456US2009106061A1Progressive vendor data management and verification in a multi-node supply networkIBM·Filed 2007·Application pending·0 cites
- 2555US7716230B2Multi-dimensional serial containment processIBM·Filed 2007·Granted May 11, 2010·0 cites·14 claims
- 2655US2016358110A1Attribute-based nomenclature in supply chainsIBM·Filed 2015·Application pending·0 cites
- 2754US7840452B2Application, method and process for managing part exchangeability across functional boundariesIBM·Filed 2006·Granted Nov 23, 2010·0 cites·15 claims
- 2854US2016358113A1Attribute-based nomenclature in supply chainsIBM·Filed 2015·Application pending·0 cites
- 2954US2016063607A1Manufacturing adaptive order load for complex configure to order productsIBM·Filed 2014·Application pending·0 cites
- 3053US8108263B2Method, system, and computer readable medium for grouping orders and creating short ordersKNIPFER IVORY WELLMAN·Filed 2007·Granted Jan 31, 2012·0 cites·19 claims
- 3148US9195954B2Autonomic manufacturing operator authorization adjustmentIBM·Filed 2013·Granted Nov 24, 2015·0 cites·6 claims
- 3247US2007203716A1Method, system, and computer program product for implementing part performance management servicesIBM·Filed 2006·Application pending·0 cites
- 3346US2009069919A1Intelligent mass production planning and routing systemIBM·Filed 2007·Application pending·0 cites
- 3445US9489651B2Autonomic manufacturing operator authorization adjustmentBUI HUNG DAO·Filed 2010·Granted Nov 8, 2016·0 cites·12 claims
- 3545US2013103607A1Determination of Projected Carrier AssignmentKNIPFER IVORY W·Filed 2011·Application pending·0 cites
- 3643US2012323638A1Production system carrier capacity prediction process and toolKNIPFER IVORY WELLMAN·Filed 2011·Application pending·0 cites
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →