Inventor · disambiguated record
Haso Peljto
Also filed as: PELJTO HASO
13 granted patents·3 pending applications·213 citations·filing 2002–2015
91Inventor score
Top patents by PatentIndex Score
16 records- 0184US7337153B2Method and apparatus for resolving energy imbalance requirements in real-timeSIEMENS POWER TRANSM & DISTRIB·Filed 2002·Granted Feb 26, 2008·48 cites·17 claims
- 0280US7085660B2Energy management system in a power and distribution systemSIEMENS POWER TRANSM & DISTRIB·Filed 2004·Granted Aug 1, 2006·52 cites·21 claims
- 0370US7454270B2Dynamic economic dispatch for the management of a power distribution systemSIEMENS POWER TRANSM & DISTRIB·Filed 2004·Granted Nov 18, 2008·29 cites·28 claims
- 0468US7321810B2Method of dynamic economic dispatchSIEMENS POWER TRANSM & DISTRIB·Filed 2004·Granted Jan 22, 2008·27 cites·28 claims
- 0566US7359878B2Pricing apparatus for resolving energy imbalance requirements in real-timeSIEMENS POWER TRANSM & DISTRIB·Filed 2002·Granted Apr 15, 2008·18 cites·8 claims
- 0665US7343361B2Apparatus for market dispatch for resolving energy imbalance requirements in real-timeSIEMENS POWER TRANSM & DISTRIB·Filed 2002·Granted Mar 11, 2008·16 cites·9 claims
- 0764US10991041B2Next-generation energy market design and implementationOPEN ACCESS TECH INTERNATIONAL INC·Filed 2015·Granted Apr 27, 2021·1 cites·16 claims
- 0862US8019485B2System and method for controlling the performance of a power generating systemSIEMENS ENERGY INC·Filed 2005·Granted Sep 13, 2011·5 cites·21 claims
- 0951US7308382B2Determining the minimum operation and shutdown timeSIEMENS POWER TRANSM & DISTRIB·Filed 2005·Granted Dec 11, 2007·0 cites·20 claims
- 1051US7299212B2Security constrained optimal dispatch for load prediction for electricity marketsSIEMENS POWER TRANSM & DISTRIB·Filed 2003·Granted Nov 20, 2007·8 cites·11 claims
- 1150US7523075B2Startup cost model using time counterSIEMENS ENERGY INC·Filed 2005·Granted Apr 21, 2009·0 cites·17 claims
- 1249US7324977B2Historical database system for resolving energy imbalance requirements in real-timeSIEMENS POWER TRANSM & DISTRIB·Filed 2002·Granted Jan 29, 2008·5 cites·9 claims
- 1346US7349887B2Security constrained optimal dispatch for electricity marketsSIEMENS POWER TRANSM & DISTRIB·Filed 2003·Granted Mar 25, 2008·4 cites·14 claims
- 1440US2005165512A1Systems and methods for selective power transferFiled 2005·Application pending·0 cites
- 1538US2003225661A1Security constrained optimal dispatch for pricing optimization for electricity marketsSIEMENS POWER TRANSM & DISTRIB·Filed 2003·Application pending·0 cites
- 1638US2003225676A1Security constrained transmission and load dispatch for electricity marketsSIEMENS POWER TRANSM & DISTRIB·Filed 2003·Application pending·0 cites
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →